Rapid Lake infrastructure work

Decontie Construction Inc. was involved in the sewer repair of Barriere Lake.

The work consisted of:

  • punctual repairs of three (3) holes
  • dislocation in the sewer conduits of the community

The work has significantly helped to reduce the amount of sand entering the wastewater collection system. The particularity of the project was that the conduits were made of Asbestos cement and were dating back to 1980.